The quantity of sand required for RCC (1:2:4) for 15 cubic metres of work is ___________
View Answer Explanation
The quantity of coarse aggregate required for RCC (1:3:6) for 20 cubic metres of work is ________
Calculate the number of cement bags required for RCC (1:2:4) for 15 m³ of work.
The unit of payment of cement concrete in lintels is _________
Which grade of pencil is used for drawing arrowheads?
What does the “Single-Stroke” lettering mean?
Which line is drawn to make the section evident?
What is the slope of inclined letters with the horizontal?
In lettering ‘A’ the height of capital letter is divided in how many parts?
The length to height ratio of a closed filled arrow head is?
Guidelines for dimensions at international level on a drawing is controlled by __________