0
The highest CBR number is required for __________
View Answer Explanation
What is the most common waste material used in construction?
Bitumen is a by-product of __________
Tar is a by-product of __________
In the initial stage of construction which type of pavement is cheap?
A good soil should have __________
The process by which the water voids are removed is called __________
If the GWT rises to the ground level, then the bearing capacity reduces by __________
What is the most common method used for the removal of voids in soil?
What is the volume of voids in the 3 phase diagram of soil?
What is the ratio of volume of voids and volume of soil solids?